Limestone Crushing System
Limestone crushing system
First, the system components
Generally located two limestone crushing system, the discharge hopper, vibrating feeder, magnetic separators, vertical shaft crusher, bucket elevator, buried scraper conveyor and limestone silo, bag filter components.

Second, the process
Car will be a certain size (particle size less than 50mm) limestone transport into the plant, measured by the power balance after Chichester, unloading into the limestone stack space, storage material generally used for FGD 3-7 days. According to the demand for FGD operation, the trolley will transport limestone to the crushing system of underground hopper, the hopper through the bottom of the feeder by, the separator, will stone into the ring hammer crusher, after broken by a stone (particle size less than 10mm) from the screw feeder into the bucket elevator, bucket elevator to the stone limestone silos, storage materials for FGD use 2-3 days. Limestone storage bin located under the mouth closed 2 weigh belt feeder, the stone to the entrance into the wet machine. Stone storage bin located on the bag filter to prevent dust when the stone removed.



